Product Details:
Payment & Shipping Terms:
|
Material: | Ductile Cast Iron | OEM: | Available |
---|---|---|---|
Finishing: | Natrual Colour, Galvanized | Size: | With Plate Dia 100mm |
Application: | To Fix Formwork | Weight: | 0.34kg, 0.5kg, 0.6kg, As Per Request |
Samples: | Available | Tech. Process: | Cast Iron, Steel Machinary |
Highlight: | tie rod construction formwork,tie rod scaffolding |
Formwork Tie Rod System of Flange Wing Nut, Water Stop, Steel Cone for Formwork
The Flanged Wing Nut is available in different diameters. With a larger pedestal, it allows a direct load bearing on walings.
It can be screwed on or loosened using a hexagon wrench, thread bar or hammer.
Steel cone is usually used in formwork tie rod system for easy removing the outer tie rod.
Formwork wing nut with flange:
Flanged Wing nut | Bar Ø (mm) | Plate dia (mm) | Height/Hex. (mm) | Weight (Kg) |
![]() |
15 | 90 | 55/27 | 0.50 |
15 | 100 | 55/27 | 0.62 | |
15 | 110 | 55/27 | 0.80 | |
20 | 120 | 60/36 | 1.00 |
![]() |
15 | 64 | 75/27 | 0.34 |
15 | 100 | 100/27 | 0.62 |
Part Name | Specification | Weight (kg) | Remark |
Tie-rod
|
D15 D20 |
1.5 kg/m 2.7 kg/m |
L=6m; Special length available upon request. |
Super plate
|
D15 | 1.28 | Used in case of tie-rod and formwork panels are not vertical. |
3-lug wing nut
|
D15 D20 |
0.97 0.78 |
For tie-rod D15; For tie-rod D20 |
Waling plate
|
120 x 120 x 6, Φ19 120 x 120 x 8, Φ19 |
0.65 0.85 |
For tie-rod and nut D15; galvanized |
Water stopper
|
D15 D20 |
0.55 0.72 |
Used in water resistant wall; With tie-rod D15 / D20 |
Anchor plate
|
D20 | 0.95 | Embedded in concrete as lost part |
Packing:
1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.
2. Different packages are used for different products:
---bundles: timber beam, steel props, tie rod, etc.
---pallet: small parts will be put in bags and then on pallets.
---wooden cases: it is available on customer's request.
---bulk: some irregular goods will be loaded in bulk in container.
Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.
Who we are:
HORIZON FORMWORK is a professional formwork solution provider for years, supplying: Formwork systems, scaffolding systems and related accessories, which are widely used in commercial, residential and infrastructural projects.
What we offer:
Wall formwork, column formwork, climbing system, table formwork, flexible slab formwork, frame scaffolding system, ringlock scaffolding system, cuplock system, form-tie system, etc.
On-site supervising support is available on request.
Why us:
With 10 years of experience, we know exactly what you need;
Strict quality control in raw material selection, production line, and pre-packing, which ensures the reliable product quality as per customer's request.
Prompt action on customer's requirments.
We are not only providing excellent products, but also offering a comprehensive and complete concrete formwork and scaffolding solution to clients.
HORIZON FORMWORK, your reliable formwork partner!
Contact Person: Mr. H. Chang
Tel: +86 319 3188757
Fax: 86-319-3156299